After pulling up the old linoleum, Jake decided the original floorboards were too far gone to reuse so he ripped those up too. For a few days the bathroom had its floor joists showing. Here is the start of the new floorboards.
Chris wiring for the two new vanity fixtures.
This is the space where the built-in shelves used to be situated over the stairs. Since those stairs were taken out, we put in a floor and will build in a cubby/vanity area, or as I call it, a primping station. :)
No comments:
Post a Comment